Skip to main content
United Nations Evaluation Group
Main navigation
  • ABOUT
    • Overview
    • Membership
    • Partnerships
  • OUR WORK
  • REPOSITORY
  • RESOURCES
    • Community Members
    • Evaluation Plan
    • News
    • Training
    • Vacancies
  • EVENTS
Login

Page Header

Back
Default publication image
Downloads: 0
Download
  • FRY-2011-002-3.doc
  • FRY-2011-002-1.doc
  • FRY-2011-002-2.doc
Project/Programme 2011
FINAL EVALUATION Transforming Residential Institutions for Children and Developing Sustainable Alternatives
Agency
United Nations Children's Fund

Overview

To respond to the needs of Government of Serbia and more specifically, Ministry
of Labour and Social Policy, UNICEF has made a decision to assist MoLSP in
their efforts to improve quality of services in residential placements and
decrease the number of children placed in residential institutions, through
their transformation. UNICEF, in close cooperation with MoLSP, designed the
project “Transforming Residential Institution for Children and Developing
Sustainable Alternatives”, which started in 2008, funded by the European Union.
The intervention was built on results and recommendations from a previous
external evaluation of deinstitutionalization process in Serbia (2006) and
Assessment of Child Protection in Serbia, conducted in 2007.

The overall purpose of the project was to reduce the number of children in
residential institutions in Serbia by 25% by 2011, through the transformation
of residential institutions and development of local institutional capacities
for provision of family support and family substitute services.

The implementation of the project was organized through four components, with
the establishment of four multi-sector thematic Working Groups:

1. Transformation of institutions and inter-municipal and operational planning
for children;
2. Strengthening accountability and monitoring mechanism;
3. General and specialized fostering;
4. Health-care family support in maternity hospitals.

Respective multi-sector Working Groups consisted of representatives of relevant
ministries, experts, practitioners, representatives of professional
associations and representatives of trade unions. The main role of Working
Groups was to advise and oversee project implementation as well as to provide
strategic direction and endorse policy documents and recommendations.

The technical and organizational support to these four Working Groups was
provided through four UNICEF contracting partners, who worked closely

Report Details

Year Published 2011
Type Project/Programme
Joint No
Partner/s N/A
Consultant name
Ana Redzic, external evaluator
Agency Focal Point Lovemore Mhuriyengwe
Focal Point Email lmhuriyengwe@unicef.org
Managed by Independent Evaluation Office No
Geographic Scope Country
Country/ies Serbia

Share:

  • Facebook
  • Twitter
  • Linkedin

Related

Evaluation of UNICEF contribution to the reduction of out-of-school children and improving access to multiple and  flexible pathways to learning
Member Publication
Project/Programme
2025
Agency :
UNICEF
Evaluation of UNICEF contributions to the reduction of OOSC and improving opportunities for alternative learning…
Downloads:
44
Default publication image
Member Publication
Project/Programme
2025
Agency :
UNICEF
Evaluation of Joint Resilience Programme in South-Central Somalia from 2018 to 2022
Downloads:
24
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Synthesis of evaluations, research, and studies generated by UNICEF Afghanistan (2021-2024)
Downloads:
14
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation of Scaling up Anticipatory Action and Shock Responsive Social Protection  in ASEAN
Downloads:
4
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation of the MoES-EU-UNICEF Partnership to Strengthen the Education System (PSES) in Lao PDR
Downloads:
14
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Joint UN Project " Accelerating Disability Inclusion for Adults and Children with Disabilities"
Downloads:
3
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation of the impact of cash transfers on return to and retention in school
Downloads:
9
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation formative du projet « Amélioration de l’accès à l’hygiène et l’assainissement selon l’approche…
Downloads:
4
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation finale UNDAF 2018-2024
Downloads:
4
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Summative evaluation of the UN Joint Programme on Girls Education-III
Downloads:
12
Back
YOU 'RE READING
FINAL EVALUATION Transforming Residential Institutions for Children and Developing Sustainable Alternatives
2011

Share

  • Facebook
  • Twitter
  • Linkedin
Footer Menu
  • About
    • Overview
    • Membership
    • Partnerships
Footer Menu Two
  • Our Work
  • Events
Footer Menu Three
  • Resources
    • Community Members
    • Evaluation Plan
    • News
    • Training
    • Vacancies
Footer Menu Four
  • Repository
    • UNEG publications
    • Member publications
  • FAQ
UNEG Secretariat

220 East 42nd Street,

Room 2036 New York, NY 10017, USA

Email: uneg.contact [at] undp.org
footer-logo
Follow Us on :
  • Twitter
  • Linkedin
  • Youtube

Copyright © 2025 - UNEG. All Rights Reserved