Project/Programme 2011
UN MDGF: Mid-term evaluation “Securing Access to Water through Institutional Development and Infrastructure” joint UNDP and UNICEF project in Bosnia and Herzegovina
Agency
United Nations Children's Fund

Overview

This mid-term review (MTR) is aimed to be highly formative in nature and was
sought to:
• improve the implementation of the JP during their second phase of
implementation;
• generate knowledge, identifying best practices and lessons learned that could
be transferred to other programmes.
It is expected that the conclusions and recommendations generated by this
evaluation will be addressed to its main users: the Programme Management
Committee (PMC), the National Steering Committee (NSC) and the Secretariat of
the Fund. As stipulated in the TOR (see Annex 4), the MTR is based on an
expedited process of a fast-paced but systematic analysis of the design,
process, results and trends of the JP, in line with the questions identified in
the TOR. This MTR has the following specific objectives:
• to discover the programme’s design quality, internal coherence (needs and
problems it seeks to solve) and external coherence with the UNDAF, the national
development strategies and the MDGs, and find out the degree of national
ownership as defined by the Paris Declaration and the Accra Agenda for Action;
• to understand how the JP operates and assess the efficiency of its management
model in planning, coordinating, managing and executing resources allocated for
its implementation, through an analysis of its procedures and institutional
mechanisms, and with that, to uncover the factors for success and limitations
in inter-agency tasks within the One UN framework;
• to identify the programme’s degree of effectiveness, its contribution to the
objectives of the Economic Governance thematic window, and the MDGs at the
local and country levels.

Report Details

Year Published 2011
Type Project/Programme
Joint No
Partner/s N/A
Consultant name
Lilit V. Melikyan
Agency Focal Point Lovemore Mhuriyengwe
Focal Point Email lmhuriyengwe@unicef.org
Managed by Independent Evaluation Office No
Geographic Scope Country
Country/ies Bosnia and Herzegovina

Share:

  • Facebook
  • Twitter
  • Linkedin

Related

Evaluation of UNICEF contribution to the reduction of out-of-school children and improving access to multiple and  flexible pathways to learning
Member Publication
Project/Programme
2025
Agency :
UNICEF
Evaluation of UNICEF contributions to the reduction of OOSC and improving opportunities for alternative learning…
Downloads:
37
Default publication image
Member Publication
Project/Programme
2025
Agency :
UNICEF
Evaluation of Joint Resilience Programme in South-Central Somalia from 2018 to 2022
Downloads:
21
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Synthesis of evaluations, research, and studies generated by UNICEF Afghanistan (2021-2024)
Downloads:
13
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation of Scaling up Anticipatory Action and Shock Responsive Social Protection  in ASEAN
Downloads:
4
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation of the MoES-EU-UNICEF Partnership to Strengthen the Education System (PSES) in Lao PDR
Downloads:
11
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Joint UN Project " Accelerating Disability Inclusion for Adults and Children with Disabilities"
Downloads:
2
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation of the impact of cash transfers on return to and retention in school
Downloads:
6
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation formative du projet « Amélioration de l’accès à l’hygiène et l’assainissement selon l’approche…
Downloads:
3
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Evaluation finale UNDAF 2018-2024
Downloads:
4
Default publication image
Member Publication
Project/Programme
2024
Agency :
UNICEF
Summative evaluation of the UN Joint Programme on Girls Education-III
Downloads:
10
Back
YOU 'RE READING
UN MDGF: Mid-term evaluation “Securing Access to Water through Institutional Development and Infrastructure” joint UNDP and UNICEF project in Bosnia and Herzegovina
2011

Share

  • Facebook
  • Twitter
  • Linkedin
Footer Menu
  • About
    • Overview
    • Membership
    • Partnerships
Footer Menu Two
  • Our Work
  • Events
Footer Menu Three
  • Resources
    • Community Members
    • Evaluation Plan
    • News
    • Training
    • Vacancies
Footer Menu Four
  • Repository
    • UNEG publications
    • Member publications
  • FAQ
UNEG Secretariat

220 East 42nd Street,

Room 2036 New York, NY 10017, USA

Email: uneg.contact [at] undp.org
footer-logo
Follow Us on :
  • Twitter
  • Linkedin
  • Youtube

Copyright © 2025 - UNEG. All Rights Reserved